PREFABRICATION

SUPERIOR QUALITY CONTROL SCHEDULE REDUCTION
Industrial Electrical Prefabrication

DUBAK'S PREFABRICATION

DUBAK ELECTRICAL IS ABLE TO REDUCE CRAFT LABOR MANPOWER LEVELS ON-SITE RESULTING FROM PREFABRICATION. MANPOWER COSTS REDUCE AS A RESULT OF CONSISTENT WAGES (NON-TRAVELING WORKFORCE) PERDIEM, OVERTIME REDUCTION, AND OTHER COMPENSATION.

Why Prefab?

There are several driving factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.

Schedule Reduction:

Prefabrication of critical path items leads to schedule reductions. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your project schedule.

Risk Mitigation:

Critical path components are some of the most complex pieces of the building. Simplifying the complex through prefabrication mitigates risk in safety by reducing overhead work and site congestion.

Superior Quality Control:

Breaking the most complex components of the project into prefabricated pieces requires intensive coordination and enhanced virtual design and construction processes. Designers and the builders must work through a level of detail not found in most construction documents. This process ensures a high level of quality that is consistent throughout the entire project.

Let Dubak Join you at Your Project Planning Table