Dubak Electrical Group is able to reduce craft labor manpower levels on-site resulting from prefabrication.

ELECTRICAL PREFABRICATION

Why Prefab?  There are several factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.  Schedule Reduction: ​ Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.
Why Prefab?  There are several factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.  Schedule Reduction: ​ Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.
Why Prefab?  There are several factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.  Schedule Reduction: ​ Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.

P R E F A B R I C A T I O N   S Y S T E M S    &    A S S E M B L I E S

Dubak Electrical Group is able to reduce craft labor manpower levels on-site resulting from prefabrication.

​

​

​

UNDERGROUND  &  DUCT BANK   |   PREFAB  CONDUIT   |   CABLE TRAY   |   METALS & STAINLESS   |   TEMP LIGHTING  ELECTRICAL DISTRIBUTION   |   TEMP POWER   |   MISC ASSEMBLES

​

Why Prefab?  There are several factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.  Schedule Reduction: ​ Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.
VdrElu0g_edited.png

OUR DELIVERY METHOD AND

STRATEGY GUARANTEES SUPERIOR PROJECT OUTCOME TO OWNERS AND PRIME CONTRACTORS

Why Prefab?  There are several factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.  Schedule Reduction: ​ Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.

Why Prefab?


There are several factors for electrical prefab systems, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.

​

Schedule Reduction:

 

Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. Electrical PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.

​

Risk Management:


Critical path components are some of the most complex pieces of prefabricated electrical building. Simplifying the complex through prefabrication mitigates risk in safety by reducing overhead work and site congestion.

​

Superior Quality Product:


Breaking the most complex components of the project into prefabricated pieces requires intensive coordination and enhanced virtual design and construction processed. Designers and builders must work through a level of detail not found in most construction documents. This process ensures a high level of quality that is consistent throughout the entire project.

​

​

SCHEDULE REDUCTION   |    RISK MITIGATION    |    SUPERIOR QUALITY CONTROLS

​

​

​

​

 

 

 

 

Our electrical prefab shop gives us the capabilities to create a wide range of elements for your facilities. Thanks to our comprehensive expertise, we can deliver virtually any type of prefab electrical panels or whatever else you need. Among the many electrical prefab assemblies we can produce are:

​

  • UNDERGROUND & DUCT BANK

  • PREFAB CONDUIT

  • CABLE TRAY

  • METALS & STAINLESS

  • TEMP LIGHTING ELECTRICAL DISTRIBUTION

  • TEMP POWER

  • MISC ASSEMBLES

  • SANITARY STRUT & SUPPORTS

  • PUZZLE CONDUIT

  • JUNCTION BOX

  • STANDS & SUPPORTS

  • PREFAB LIGHTING

  • TRAPEZE

  • COATED STAINLESS ROD

 

Customers across the continental United States turn to us because we have the most complete lineup of services to keep their operations running as smoothly as possible. To learn more about how we can fulfill your prefabrication needs, get in touch with us today.

​

Why Prefab?  There are several factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.  Schedule Reduction: ​ Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.